Why Construction Costs Keep on Changing

One of the biggest frustrations for property developers and investors is the fact that construction costs rarely remain constant from the beginning to the end of a project. A project that was initially estimated at Ksh 100 million can easily end up costing roughly double the amount by the time it is completed.

While some cost increases are unavoidable, others result from poor planning, inadequate cost monitoring and decisions made during implementation. All this is avoidable or can be controlled with professional  project management.

Changes in Market Prices

Construction projects are exposed to general market forces. The prices of cement, steel, timber, fuel, electrical fittings and other construction materials fluctuate depending on supply, demand, transportation costs, taxation, exchange rates and other economic factors.

However, construction contracts are only valid for a specified period. Some contracts protect the client  for three months, while others may extend to one or two years. The prices quoted at the time of tendering may therefore not reflect the prevailing market prices when materials are eventually purchased.

This is particularly significant in projects with long implementation periods. Where a contract does not adequately address price fluctuations, the contractor may seek adjustments, or the developer may have to absorb the additional costs.

Uncontrolled Variations During Implementation

Changes to the original scope of works are another major cause of cost escalation.

It is common for developers or consultants to introduce changes once construction is underway. These may include changing finishes, adjusting room layouts, adding facilities or modifying structural and service installations. The problem is not necessarily the variations themselves, as some are essential to boost overall functionality of the building, but the failure to establish their financial implications before implementation.

A seemingly minor change can have a wider cost impact. For example, changing a floor finish may affect material costs, labour, installation time, wastage and even the work already completed. Where variations are approved without proper cost evaluation and documentation, the project budget gradually loses control.

Inadequate Initial Costing

A construction estimate is only as reliable as the information and scope used to prepare it.

Some projects begin with budgets that do not adequately account for all the necessary work. Certain items are overlooked, quantities are underestimated, specifications are unclear, or supporting infrastructure is excluded altogether.

For example, a developer may concentrate on the main building while overlooking external works, drainage, water storage, electrical connections, access roads, landscaping, boundary walls and statutory requirements which were only given an assumed figure.

Poorly Assessed Provisional Sums

Provisional sums are allowances included in a construction budget for works or items whose final scope or cost has not yet been established.

They are useful where certain information is unavailable during tendering. However, they are sometimes used as convenient placeholders for items that could actually be investigated and costed in advance.

For example, electrical installations, mechanical services, specialist finishes and external works may be assigned arbitrary provisional amounts without adequate supporting assessments.

The danger is that these allowances create an impression that the project is adequately funded when, in reality, significant costs remain unresolved. In our experience, these items can actually be properly costed if drawings are detailed enough and also borrowing from experience of other projects.

Unforeseen Site Conditions

Not everything can be established during the design and investigation stages.

Excavation may reveal unsuitable soils, groundwater, buried structures, rock formations or existing services that were not identified during preliminary investigations.

Although proper site investigations reduce the likelihood of these occurrences, some conditions only become apparent once construction begins.

Delays and Extended Project Duration

When a project takes longer than anticipated, the cost of maintaining the site increases. Labour and general preliminaries such as equipment hire, site management, security, temporary facilities and other running expenses may continue accumulating.

Delays can also expose a project to further material price increases, changes in financing costs and additional contractual claims.

Some delays are attributable to the contractor, while others arise from late payments, delayed approvals, design changes, client decisions or circumstances beyond the parties’ control.

Force Majeure and Other External Events

Construction is also vulnerable to events that are largely outside the control of the developer, contractor and consultants.

These may include extreme weather, floods, pandemics, geopolitics, trade restrictions and other disruptive events. For example, a health pandemic limits availability of labour, trade restrictions limit availability of materials etc. Depending on the circumstances and contractual provisions, they may result in additional costs, extensions of time or other contractual remedies.

In conclusion, such incidents are inevitable and required good coordination and management to fix what is possible at the planning stage. Such include being thorough with design details, costing, forecasting on what is possible and applying contingency measures and also on the part of the client cooperation as per terms set on the contract with some flexibility as well.

The problem is not necessarily the variations themselves, as some are essential to boost overall functionality of the building, but the failure to establish their financial implications before implementation.

For more information, reach out to us via info@rickfes.co.ke

At Rickfes Construction Ltd., we help local, diaspora and foreign clients manage construction costs throughout project implementation. We provide professional oversight of budgets, variations, procurement, progress and contractual obligations, helping identify cost risks early, control expenditure and keep projects aligned with their approved scope, budget and programme.